The Victory Fiedler Project continues to advance with lots of work being accomplished in the modular factory in Brooklyn. Below are some pictures documenting the progress.
It all begins with raw materials and supplies. Above, a collage of pictures from the factory shows, clockwise from top left, a drywall supplied to the factory, lighting fixtures, sinks, kitchen hoods, kitchen cabinets, and lavatories awaiting installation.
Above: Panels of drywall on metal studs ready to be attached to the steel module frames.

Above: A row of six or more modules with drywall and metal studs in place, all anchored to the solid steel frames. As each module progresses down the assembly line from back to front, more and more finishing touches are added till the modules are completed.
Above: A module having interior finishes put in. This picture also shows the steel rails on which each module travels as it completes its assembly.
Above: A finished kitchen with doors taped down and ready for delivery to the site
Above: A completed module with fenestration just before it leaves the factory floor.
Above: Completed modules await delivery to the site.





